Rainwater tank work progress
We had the rainwater detention tank work start today. The location is now dug. Tomorrow we will have the tank installed.
A mountain of dirt. Will be used to fill the low soil level at the front of the house.
The bunker hole. lol
Massive roots from an old tree dug out.
The painters were also there today doing the paint touch-ups and the fixing of the skirting.