Upon visit lunchtime today, saw the rubbish all cleaned and being taken away.
Showing posts with label Rubbish. Show all posts
Showing posts with label Rubbish. Show all posts
Saturday, 25 May 2013
Friday, 24 May 2013
Clean up started
Looks like most of the major work is now complete, ready for Practical Completion Inspection (PCI) on Monday at 7:30am.
Drove by today at lunch and the rubbish bins were delivered. Quite possible the site will be clean by tomorrow. No one inside, so I could not access inside, see where things are up to and take photos. Monday...
Over the weekend, I'll have to sit down and go through our tender and plans and match them with PCI check list, ready for Monday morning.
Looks like there will be no power, as connection to grid will not happen till Monday. Claiming rain, but as you can see, it was not raining today. If others can come in and clean the site, surely the connection could have been done as well. They already have the money paid, no need to rush out and do the actual job on time. Not happy!
Also, next Wednesday, private inspection (TBC). I have booked DK Building Certifiers (www.dkbuildingcertifiers.com.au) to inspect and report any issues. I do not anticipate any major ones, but for $330, it is a peace of mind.
Drove by today at lunch and the rubbish bins were delivered. Quite possible the site will be clean by tomorrow. No one inside, so I could not access inside, see where things are up to and take photos. Monday...
Over the weekend, I'll have to sit down and go through our tender and plans and match them with PCI check list, ready for Monday morning.
Looks like there will be no power, as connection to grid will not happen till Monday. Claiming rain, but as you can see, it was not raining today. If others can come in and clean the site, surely the connection could have been done as well. They already have the money paid, no need to rush out and do the actual job on time. Not happy!
Also, next Wednesday, private inspection (TBC). I have booked DK Building Certifiers (www.dkbuildingcertifiers.com.au) to inspect and report any issues. I do not anticipate any major ones, but for $330, it is a peace of mind.
Wednesday, 6 March 2013
Gyprocks delivered?
Looks like some items have been delivered, as lot of cornices have been delivered. The Site Supervisor mentioned they should have been delivered last Wednesday (27/02/13). Gyprock should have been up and finished by this week. So far, looks like delayed for a week.
Since I have no access to visit inside, cannot confirm if any more inside.
Also delivered the blue food scrap bin charged $220, that possibly would never had been delivered, had I not re-read my tender!
It shows, it is a good idea to always go over the documents.
Wednesday, 27 February 2013
Insulation complete
Today, the insulation was done. Here are some photos.
Upstairs living room corner issue, still unresolved! Arrgh!
Still a corner, not a box!
In our tender, we have been charged $220 for rubbish bin with lid for food scrapes. I mentioned to Masterton, and this is what we got. Expensive sign! I think I need to be bit more firm. Get one or refund.