Showing posts with label Toilets. Show all posts
Showing posts with label Toilets. Show all posts

Saturday, 4 May 2013

Air-con and Robes

On Friday we had our Air-Con vents installed and controller.





Also the carpenters have finished off the robes with shelving and hangers.



All the plumbing is also complete, including kitchen sink and powder room.



Wednesday, 1 May 2013

Plumbing & Electricals

Today finally some work done.

We had the electrician come in and do all the light fittings, downlights, power switches and power points. Also done the toilet vents.

The plumber was finishing off the toilets and drainage for basins and kitchen sink.

Display downlight

Living room downlights

bathroom service hole vent in kitchen

Ensuite vent

Ensuite toilet installed

Spa sprout

Ensuite basin

Bath sprout

Shower head

Toilet installed

Under balcony now painted

The safety rails also have been removed.