We had the electrician come in and do all the light fittings, downlights, power switches and power points. Also done the toilet vents.
The plumber was finishing off the toilets and drainage for basins and kitchen sink.
Display downlight
Living room downlights
bathroom service hole vent in kitchen
Ensuite vent
Ensuite toilet installed
Spa sprout
Ensuite basin
Bath sprout
Shower head
Toilet installed
Under balcony now painted
The safety rails also have been removed.
No comments:
Post a Comment