Slow after sales service

The after sales service of Masterton is really very slow. It has taken weeks to get the rangehood cover finally done. The garage wall patch is still waiting for painters to come in and paint. Not heard from them when this will happen and no email response.



I have not received any response for my shower door problem, though I emailed the SS several times.

Here can be seen a photo of the Display Home ensuite shower door having a rubber seal at the bottom, as well as no gaps on the sides.


Our home completed (well, almost).

Next is to organise our window covers, most likely plantation shutters and couple of vertical blinds.

Tuesday, 25 June 2013

Cooktop done

Today we had the kitchen joiner and the gasfitter came is and resolve the cooktop issue.

We can cook now! Yay!

Tomorrow, a busy day on site with workers as well as deliveries of some furniture.

Sunday, 23 June 2013

Final touches

We had the plumber come in on Saturday to install the forgotten spa motor. So now that's done, the only items left are the cooktop and the rangehood cover.

SMEG gas cooktop (nearly)

SMEG ducted rangehood (nearly)

SMEG Electric Oven

SMEG Dishwasher

Well we have ducted vacuum unit installed, but looks like they missed to place a power point for the unit!

No power point to run it!

I was aware so I kept reminding the Site Supervisor about the power point for our spa, but not knowing what this unit looked like and how it would be powered, I missed it too.

I now expect the Site Supervisor to come back and install a power point for it. I already paid over $1200 for it and do not expect to pay a penny more.

And finally, here is our new front yard statue, to conceal the rainwater tank service hole.


Saturday, 4 May 2013

Air-con and Robes

On Friday we had our Air-Con vents installed and controller.





Also the carpenters have finished off the robes with shelving and hangers.



All the plumbing is also complete, including kitchen sink and powder room.



Saturday, 20 April 2013

More progress

Painters were working today (Saturday). Paint should finish by end of next week.

Kitchen cornices done. Looks really nice finish now.

The vent hole for upstairs bath plumbing access. There is another one like it in the formal dining room.

The view from the balcony. King of the street LOL!


Or, maybe not yet!

Stairway handrails painted.


View from of the front door.

The house as it stands today.

Thursday, 4 April 2013

Wet area progress

Most of the wet area tiles are now done. I expect to finish off by end of the week. Yay! Painting should start next week or so.

Edges of the balcony tiled

Powder room tiles

Ensuite tiling in progress


Shower with feature section

Main toilet with concealed drain

Main bathroom tiles

Main bathroom vanity

Laundry tiles

Laundry door landing

Kitchen island splashback

Kitchen splashback (no grout yet)

The house as it stands today


Tuesday, 26 March 2013

Kitchen complete

Visit at lunch time (on the way back from tile selection), while workers were there finishing off the granite benchtops, and took some photos.

Island bench


Cook-top granite bench getting cleaned.

Ensuite vanity

Main bathroom vanity

Main bathroom shower water sealed.

Thursday, 21 March 2013

Kitchen cabinets delivered

Upon site visit today, we have kitchen and bathroom cabinets delivered.

Island bench front panel

Main bathroom cabinet

Ensuite cabinet