Thursday, 16 May 2013

Upstairs flooring complete

Upstairs flooring of laminate timber is now complete. Got there just in time as they were packing up, sneaked in and took some photos.





Some photos of 99% finished ground floor tiles. Some places, the grout was missing along a line from one end of the room to the next. Not sure why.





The rubbish allocated fenced are is moved to allow the installation of the power pole. Arghhh!



And to finish off with, the front door landing & steps. (Most likely the steps will be covered by the driveway, unless we change our minds).




Tuesday, 23 April 2013

Front slab & painting

Looks like on Monday the painters have finished their work.

The front slab concrete was also poured in on Monday

Now that the front slab is one, tiles should be next for them, once fully dried.


The back laundry steps done.

Front door undercoat done.


Few pictures of the internal paint and door handles.

Internal garage door with lock


Linnen



Bathroom accessories installed.
Ensuite

Toilet

Main bathroom

What Da! Towel rail behind and along the way! Some people have no common sense. Doh! This will have to be changed. Will move it to the wall on the left of basin.

Clothes. Whos? Why? LOL!

Saturday, 20 April 2013

More progress

Painters were working today (Saturday). Paint should finish by end of next week.

Kitchen cornices done. Looks really nice finish now.

The vent hole for upstairs bath plumbing access. There is another one like it in the formal dining room.

The view from the balcony. King of the street LOL!


Or, maybe not yet!

Stairway handrails painted.


View from of the front door.

The house as it stands today.

Friday, 19 April 2013

Front door slab

By lunch time, the front door slab formwork was now in place. I hope the concrete would be poured in today or Monday.

The back laudry steps landing also has its formwork in place.

The garage door also installed. Will have closed picture later, as workers were going in and out.

The bedroom sliding door rails installed.

Painting is still in progress. Possible paint end date is end of next week.

Sunday, 31 March 2013

Front door leveling

I think the front door leveling issue is fine.

As can be seen, the slab is perfectly level.

The lighter colour brick with the termite control plastic has a bit of angle.

The front slab darker brick level is fine too.

I think once the front door slab goes on, it will be all level. The front door slab will be 30mm below main slab level anyway.

I will ask the Site Supervisor if the 1cm difference will have any impact to the rest of the bricks on the left of the house.

The top of the door, where the metal beam is, looks level. I guess, balanced by bit of extra mortar in between bricks.