Front slab & painting

Looks like on Monday the painters have finished their work.

The front slab concrete was also poured in on Monday

Now that the front slab is one, tiles should be next for them, once fully dried.


The back laundry steps done.

Front door undercoat done.


Few pictures of the internal paint and door handles.

Internal garage door with lock


Linnen



Bathroom accessories installed.
Ensuite

Toilet

Main bathroom

What Da! Towel rail behind and along the way! Some people have no common sense. Doh! This will have to be changed. Will move it to the wall on the left of basin.

Clothes. Whos? Why? LOL!

2 comments:

  1. Have you ever consider a door opening under your staircase?
    It makes such a good storage area. My staircase is same as your and I have stored so many things under stairs.

    ReplyDelete
    Replies
    1. Yes, we are. But due to regulations, we have to do it after handover.

      Delete