Showing posts with label Garage. Show all posts
Showing posts with label Garage. Show all posts

Wednesday, 3 July 2013

Driveway half way

Finally the sun came up, and will stay for the rest of the week.

Today, the driveway is now half way done. All formwork complete. Tomorrow we will have the crossing pour, then on Saturday, the main section.



The driveway will have same colour as our gutters and main door` ColourBond Loft©.

We also had the Masterton electrician come in and add the missing power pint in the garage for the vaccum unit. Punched few holes in to get the wiring across, as it's not possible from the roof, as there is no access. This is something Masterton missed and now costing them to come back and do it again. They will have to come back to patch the wall and paint.



Well, this Saturday, also booked for removalists for the big move!

Not sure how both parties will work together. Gulp!!

Friday, 19 April 2013

Front door slab

By lunch time, the front door slab formwork was now in place. I hope the concrete would be poured in today or Monday.

The back laudry steps landing also has its formwork in place.

The garage door also installed. Will have closed picture later, as workers were going in and out.

The bedroom sliding door rails installed.

Painting is still in progress. Possible paint end date is end of next week.

Saturday, 9 March 2013

House has been gyprocked

A sneak peek on the progress of the gyprock insulation so far.

Garage

Main hallway feature wall and bulkheads

Formal Lounge room

Kitchen wall

Rumpus room with feature wall

Downstairs living

Upstairs living

Master bedroom bulkheads