This is a general Practical Completion Inspection check-list I have, which will be updated as I change it to suit our plan. Never the less, it is a great guide for anyone needing some idea what to check and look out for before hand over.
I would also recommend to get a private/independent site inspector involved for the PCI, as they know what to look out for, not just for PCI but during different stages of construction.
1. Portico and under balcony
Paint ok?
Check bricks for chips
Check mortar correct
Check cornice for cracks
Check steps and tiling
2. Foyer/Hallway
Door stop for entry door
Check door opens/closes/locks
Door stop for garage door
Down lights line up?
Ceiling & Check cornice for cracks
Check door + paint
Check floor tiles inspect for scratches
Check skirting
Check walls are level using level meter
20mm maximum gap between door and FFL
Check light switches
test alarm
Electrical plan checked for consistency?
3. Formal living
Ceiling & Check cornice for cracks
Check Paint
Check walls are level using level meter
Power points work?
Light switches work and correctly linked
Windows open and close correctly
Windows and frames not scratched inside and outside
Check tiles
Check aircon location
Electrical plan checked for consistency?
4. Dining
Check for any chipped tiles
Check for any paint imperfections
Check skirting for any damage
Check windows work and lock
Ceiling & Check cornice for cracks
Check walls are level using level meter
Power points work?
Light switches work and linked correctly?
20mm maximum gap between door and FFL
Light switch positioned correctly?
Check aircon location
Electrical plan checked for consistency?
5. Kitchen
Check area behind fridge is sealed
Check fridge water tap working
Aircon duct locations
Ceiling & Check cornice for cracks
Check Paint
Check walls are level using level meter
Power points
Power point for dishwasher
Light switches linked correctly?
Windows open and close correctly
Windows and frames not scratched inside and outside
Check floor tiles inspect for scratches
Check kitchen cabinet doors work properly ensure they line up, check for any marks, dents scratches etc.
Check stone benchtops for uniform joints, aligned etc
Test tap
Plugs?
Inspect rangehood ok
Check downlights are fitted properly
Check phone point area and painted properly
Electrical plan checked for consistency?
Check Stove
Check if tiling around splashback complete
6. Family
Aircon duct locations
Ceiling & Check cornice for cracks
Paint
Check walls are level using level meter
Power points
Light switches
Check floor tiles inspect for scratches
Windows open and close correctly
Check aircon location
Electrical plan checked for consistency?
7. Rumpus
bifold door opens and closes properly and locks?
door stop for bifold doors?
Aircon duct locations
Ceiling
Check walls are level using level meter
Check paint
Power points
Light switches
Check floor tiles inspect for scratches
20mm maximum gap between door and FFL
Check cornice for cracks
Check switches for rear and side of house (switch next to BF door)
Electrical plan checked for consistency?
8. Powder room
door stops?
Silver waste outlet in line with tiles
Test Bucket of water run-off to waste
Ceiling & check cornice for cracks
Check walls are level using level meter
Check paint
Power points
Light switches work?
Check ducted fan working correctly
20mm maximum gap between door and FFL
Test tap
Plugs?
Test toilet
Electrical plan checked for consistency?
Vanity and stone bench top ok?
9. Laundry
door stop
Check doors for scratches
Silver waste outlet in line with tiles
Test Bucket of water run-off to waste
Ceiling & check cornice for cracks
Check walls are level using level meter
Check paint
Power points work
Light switches
Doors open fine and don't smash the wall (door stopper?)
20mm maximum gap between door and FFL
Test tap
Plugs?
Test metal tub cabinet and inspect
Electrical plan checked for consistency?
10. Garage
Check paint
Power points
Light switches
Ceiling
Check walls are level using level meter
20mm maximum gap between door and FFL
Electrical plan checked for consistency?
Check door opening mechanically with remote – make sure opens smoothly
Inspect garage panel door
Check ducted vac works correctly
Check data box wired and labelled correctly
11. Stairs
Check lights work
Paint check cornice for cracks
Ceiling
Check walls are level using level meter
Light switches & Power points
Check painted under balustrade capping at top of painted wall
Check carpet
Electrical plan checked for consistency?
12. Main bedroom incl intermediate area
Ceiling check cornice for cracks
Check paint
Check walls are level using level meter
Power points
Light switches
Doors open fine and don't smash the wall (door stopper?)
Check laminate flooring
20mm maximum gap between door and FFL
Check aircon location
Electrical plan checked for consistency?
Clean bricks on window sills
13. Ensuite
Silver waste outlet in line with tiles
Test Bucket of water run-off to waste
Check cabinet doors work properly and finish and ensure they line up vanity and stone bench top ok?
Check no scratches on mirror and shower screen
Paint & check cornice for cracks
Ceiling
Check walls are level using level meter
Check floor tiles inspect for scratches
Window opens and closes correctly
Light switches linked correctly
Test tap and shower taps
Plugs?
Test toilet
Power points
Electrical plan checked for consistency?
Check spa tap and test motor (Fill water and run?)
14. Hallway incl linen press
Check paint
Walls
20mm maximum gap between door and FFL
Check cornice for cracks
Electrical plan checked for consistency?
Check laminate flooring
Check linen press doors and shelving
15. Bedroom 2 incl robe
Check paint
Ceiling & check cornice for cracks
Check walls are level using level meter
Check robe doors open close and level
Check laminate floor
Light switch
Power points
Check window
Check frame
20mm maximum gap between door and FFL
Check aircon location
Electrical plan checked for consistency?
16. Bedroom 3 incl robe
Check paint
Ceiling & Check cornice for cracks
Check walls are level using level meter
Check robe doors open close and level
Check laminate floor
Light switch
Power points
Check window
Check frame
20mm maximum gap between door and FFL
Check aircon location
Electrical plan checked for consistency?
17. Bedroom 4 incl robe
Check paint
Ceiling & Check cornice for cracks
Check walls are level using level meter
Check robe doors open close and level
Check laminate floor
Light switch
Power points
Check window
Check frame
20mm maximum gap between door and FFL
Check aircon location
Electrical plan checked for consistency?
18. w/c
check tiling for chips/scratches
check floor waste outlet direction
Test Bucket of water run-off to waste
check painting
Check walls are level using level meter
check window works
20mm maximum gap between door and FFL
Check cornice for cracks
Test toilet
19. Main Bathroom
check if switches correspond with lights
Silver waste outlet in line with tiles
Test Bucket of water run-off to waste
check for any chipped or cracked wall, floor, bath tiles etc
check grouting is complete in all areas
check painted areas for marks, chips, scratches
Check walls are level using level meter
check painting of door – both sides
check mirror, taps, shower screens
Check vanity doors and benches work properly and finish and ensure they line up
Check no scratches on mirror and shower screen
20mm maximum gap between door and FFL
Test tap and shower taps and bath tap
Plugs?
Electrical plan checked for consistency?
Check paint
Ceiling & Check cornice for cracks
Check window
Check frame
20. Front of house
paint around windows weathered stone
check ceiling under balcony?
Check all windows vertically align with brick
Check plastic seal under windows set correctly
Sensor light location– sense both people walking in path and cars driving up driveway
Clean balustrade on balcony
Clean bricks on window sill outside main bedroom
Paint rail on balcony ironstone
Check if bricks are cleaned properly
Check downpipes are secure and fixed
Check cornice for cracks under portico and balcony
Test tap
Electrical plan checked for consistency?
22. East side of house
paint around windows weathered stone
Check all windows vertically align with brick
Check plastic seal under windows set correctly
pipe for aircon leads
Check if bricks are cleaned properly
Check downpipes are secure and fixed
Test tap
Electrical plan checked for consistency?
Garage door scratched?
Check bunker light works
23. West side of house
paint around windows weathered stone
Check all windows vertically align with brick
Check plastic seal under windows set correctly
paint vent from rangehood
check water meter is not dented/broken
Check of bricks are cleaned properly
Check downpipes are secure and fixed
Inspect mortar
Electrical plan checked for consistency?
24. Rear of house
paint around windows weathered stone
Check all windows vertically align with brick
Check plastic seal under windows set correctly
check if positioning of lights conflict with down pipes hold our light in position
check bifold door works
check bifold door now closes properly
door stops for bifold door?
Check metal sill above bifold door?
Check of bricks are cleaned properly
Check downpipes are secure and fixed
Electrical plan checked for consistency?
(Updated 12/9/2012)