Looks like the floor tiles are almost done. Edges and corners are what's left, then grouting.
A quick photo from the outside through a window.
No one there today, but I guess they have to give 24 hours for it to settle and dry before they can walk on them to complete the rest.
Showing posts with label Floors. Show all posts
Showing posts with label Floors. Show all posts
Thursday, 9 May 2013
Wednesday, 8 May 2013
Floor tiling started
Floor tiling has started today and I presume it will be done by Friday.
Hopefully I'll be able to take better photos once all done.
Tuesday, 16 April 2013
Yet another re-selection!
And YES! We have to re-select our laminate timber flooring as well.
Got a call from the supplier saying the laminate timber flooring we chose is now discontinued!
I wonder when Masterton will get the idea that selecting colours 6-8 months ahead is NOT working.
Lucky, the sales person will post samples for me to chose from, saving me 2 hours drive, each way!
At the same time, the flooring is booked in for 16th of May. So that means no PCI till mid next month. Only recently the Site Supervisor told me PCI end of April.
Is he expecting to do PCI before flooring is done? Not if I have a say in it.
Breath in, breath out...Relax...
Got a call from the supplier saying the laminate timber flooring we chose is now discontinued!
I wonder when Masterton will get the idea that selecting colours 6-8 months ahead is NOT working.
Lucky, the sales person will post samples for me to chose from, saving me 2 hours drive, each way!
At the same time, the flooring is booked in for 16th of May. So that means no PCI till mid next month. Only recently the Site Supervisor told me PCI end of April.
Is he expecting to do PCI before flooring is done? Not if I have a say in it.
Breath in, breath out...Relax...
Wednesday, 10 April 2013
Wet area floor tiles
All of upstairs wet area floor tiles are placed, waiting for grouting.
The spa and bath formwork also in place.
The balcony floor tiles are also in place.
Also in place the front door landing, fixing the slant issue as expected.
The spa and bath formwork also in place.
Ensuite corner spa
Ensuite floor
Main bath
Main bathroom
Toilet floor
The balcony floor tiles are also in place.
Also in place the front door landing, fixing the slant issue as expected.
Thursday, 4 April 2013
Wet area progress
Most of the wet area tiles are now done. I expect to finish off by end of the week. Yay! Painting should start next week or so.
Edges of the balcony tiled
Powder room tiles
Ensuite tiling in progress
Shower with feature section
Main toilet with concealed drain
Main bathroom tiles
Main bathroom vanity
Laundry tiles
Laundry door landing
Kitchen island splashback
Kitchen splashback (no grout yet)
The house as it stands today
Tuesday, 26 March 2013
Re-selecting main tiles
Got a call today from Tiles Direct, our tiles supplier, informing me that the main area tiles I selected, are no longer available, discontinued. They asked me if I could visit their showroom ASAP to select alternative tile, as they are planned for delivery tomorrow.
So I had to leave work for nearly 4 hours to drive to Seven Hills, select and alternative tile and drive back. At least if they would have alternative. Non of their tiles matched. No matte soft white tiles 400x400mm.
The closest colour I could choose was that had a bit of cream, but close enough I guess.
So I had to leave work for nearly 4 hours to drive to Seven Hills, select and alternative tile and drive back. At least if they would have alternative. Non of their tiles matched. No matte soft white tiles 400x400mm.
The closest colour I could choose was that had a bit of cream, but close enough I guess.
(Original at bottom)
Photos really do not show the subtle difference. (Original on right)