Showing posts with label Lights. Show all posts
Showing posts with label Lights. Show all posts

Wednesday, 19 June 2013

Landscaping Day 3

Most of the landscaping is now done, as well as driveway and feature light wiring.

Once the driveway is done, then they will come back and finish off the rest and the lights.




some of the condutes for wiring driveway and feature lights.

Right hand side paving in progress.

Wednesday, 5 June 2013

Rainwater tank work progress

We had the rainwater detention tank work start today. The location is now dug. Tomorrow we will have the tank installed.

A mountain of dirt. Will be used to fill the low soil level at the front of the house.

The bunker hole. lol

Massive roots from an old tree dug out.

The painters were also there today doing the paint touch-ups and the fixing of the skirting.

And for a Sydney Vivid Light Show from last night.