Building Santorini Mk2, Contemporary Façade
A journey of building our new home with Masterton Homes
Showing posts with label
Paving
.
Show all posts
Showing posts with label
Paving
.
Show all posts
Wednesday, 19 June 2013
Landscaping Day 3
Most of the landscaping is now done, as well as driveway and feature light wiring.
Once the driveway is done, then they will come back and finish off the rest and the lights.
some of the condutes for wiring driveway and feature lights.
Right hand side paving in progress.
Older Posts
Home
Subscribe to:
Posts (Atom)