Showing posts with label Doors. Show all posts
Showing posts with label Doors. Show all posts

Sunday, 31 March 2013

Front door leveling

I think the front door leveling issue is fine.

As can be seen, the slab is perfectly level.

The lighter colour brick with the termite control plastic has a bit of angle.

The front slab darker brick level is fine too.

I think once the front door slab goes on, it will be all level. The front door slab will be 30mm below main slab level anyway.

I will ask the Site Supervisor if the 1cm difference will have any impact to the rest of the bricks on the left of the house.

The top of the door, where the metal beam is, looks level. I guess, balanced by bit of extra mortar in between bricks.

Tuesday, 12 March 2013

Cornices Done

All the cornices all around the house internals, including the garage, are done.

Main hallway bulkheads

Living room

Rumpus room

Upstairs hallway

Main bedroom 

We also have our doors delivered. I guess we should expect lock-up soon!
Main front door

all internal doors

as well as skirting boards