The front slab concrete was also poured in on Monday
Now that the front slab is one, tiles should be next for them, once fully dried.
The back laundry steps done.
Few pictures of the internal paint and door handles.
Internal garage door with lock
Linnen
Bathroom accessories installed.
Ensuite
Toilet
Main bathroom
What Da! Towel rail behind and along the way! Some people have no common sense. Doh! This will have to be changed. Will move it to the wall on the left of basin.
Clothes. Whos? Why? LOL!