More progress

Painters were working today (Saturday). Paint should finish by end of next week.

Kitchen cornices done. Looks really nice finish now.

The vent hole for upstairs bath plumbing access. There is another one like it in the formal dining room.

The view from the balcony. King of the street LOL!


Or, maybe not yet!

Stairway handrails painted.


View from of the front door.

The house as it stands today.

Wednesday, 17 April 2013

Wet areas complete

The scaffolding is now down and the house can be seen.

Painters were running the second coat and painting the internal doors.




The laundry tub is installed

Rangehood ducting to outside is installed.

The main bathroom bath and ensuite spa are now installed. While there, the shower screen guy was measuring the shower areas. So, I expect that to happen by next week too.


The balcony railing and privacy screen is also installed.


The corner, under the stairs might need cornices put in.

Tuesday, 16 April 2013

Scaffolding down

Finally the scaffolding is down and you can see the house now.

It was late evening (7pm) when I dropped by to see they have finished the balcony railing as well. Too dark to take any photos.

Peeking in the window with a torch, the bath is no longer sitting in the formal lounge room. I hope they placed it in place.

The internal garage door also had a wet paint.

I might give a visit during my lunch tomorrow and see where things are up to inside.

As far as the sign is concerned, they can shove it up their ass!

Saturday, 23 February 2013

Rain, Rain, Go away!

Rain foretasted all of next week. I bet you anything, the small section of our roof tiles not completed last week, will claim rain days! AND no work will be carried forward. As if work was going anywhere, now it will be at stand still.

The issue with our air-con dropper point (move from one room to the correct room, on the other side of the wall) still issue, as the plan clearly states box square corner, but the move done (finally after months of asking), but a corner triangle. The carpenter taken the quick way out of it. I hope our SS will correct this ASAP. Not Happy M!

Wall patched with weatherboard.



It looks like only few hours of work per week is being done. This week, eaves installed. That's all!

Panels for the balcony.
Some of the site rubbish has been cleaned and taken away.


Saturday, 16 February 2013

Bricks Tagged to frame


The bricks are now tagged to the frame all around the house.

The balcony railing posts are now in place too.