Showing posts with label Ensuite. Show all posts
Showing posts with label Ensuite. Show all posts

Tuesday, 16 July 2013

Slow after sales service

The after sales service of Masterton is really very slow. It has taken weeks to get the rangehood cover finally done. The garage wall patch is still waiting for painters to come in and paint. Not heard from them when this will happen and no email response.



I have not received any response for my shower door problem, though I emailed the SS several times.

Here can be seen a photo of the Display Home ensuite shower door having a rubber seal at the bottom, as well as no gaps on the sides.


Our home completed (well, almost).

Next is to organise our window covers, most likely plantation shutters and couple of vertical blinds.

Tuesday, 7 May 2013

Shower screen done

Had a meeting with our SS yesterday (He was going to postpone yet again!) and discussed about the driveway changes and the power pole ground level. Since the front yard ground will be levelled down to the level of the kerb, I had to inform our SS and make sure the power pole was installed at the new level.

Today, the ensuite shower screen is in place now, as well as all of the the bathroom mirrors.



Main bathroom shower screen ready to be installed. But I think it is the wrong size! Too wide.

The main vanity basin still missing (sitting on the floor next room), with wall-to-wall mirror. The towel holder visible in the background, will move to the left hand side.

A close-up of the laundry taps

The electrical box is also installed with the fuse boxes and thr 3-phase power.

Wednesday, 17 April 2013

Wet areas complete

The scaffolding is now down and the house can be seen.

Painters were running the second coat and painting the internal doors.




The laundry tub is installed

Rangehood ducting to outside is installed.

The main bathroom bath and ensuite spa are now installed. While there, the shower screen guy was measuring the shower areas. So, I expect that to happen by next week too.


The balcony railing and privacy screen is also installed.


The corner, under the stairs might need cornices put in.

Thursday, 4 April 2013

Wet area progress

Most of the wet area tiles are now done. I expect to finish off by end of the week. Yay! Painting should start next week or so.

Edges of the balcony tiled

Powder room tiles

Ensuite tiling in progress


Shower with feature section

Main toilet with concealed drain

Main bathroom tiles

Main bathroom vanity

Laundry tiles

Laundry door landing

Kitchen island splashback

Kitchen splashback (no grout yet)

The house as it stands today


Tuesday, 26 March 2013

Kitchen complete

Visit at lunch time (on the way back from tile selection), while workers were there finishing off the granite benchtops, and took some photos.

Island bench


Cook-top granite bench getting cleaned.

Ensuite vanity

Main bathroom vanity

Main bathroom shower water sealed.

Thursday, 21 March 2013

Kitchen cabinets delivered

Upon site visit today, we have kitchen and bathroom cabinets delivered.

Island bench front panel

Main bathroom cabinet

Ensuite cabinet

Wednesday, 20 March 2013

Wet areas sealed

Looks like today all the wet areas have been sealed.

Laundry

Main Bathroom

Ensuite

Ensuite

Toilet

The balcony is also has the seal applied.


Few external power points are also installed.


All downpipes are now connected to the main stormwater tank system. (tank yet to be dug up and installed).