Friday, 21 June 2013

Full day of work


  • 7:00am - Arrived at site, open door to let tradies installing and finishing off work.
  • Driveway workers start work
  • Garage door installer finishes off the automatic door system
  • Kitchen appliances arrive and are installed. This included oven and rangehood.
  • Santinel alarm and data technician arrived, checked all TV, Data and security cables, tested the phone - OK, tested data - OK, security - Checked! Installed and tested the ducted vacuum.
  • Gas fitter arrived to install the gas connection and cooktop. Except, the granite benchtop is about 5mm short and could not get the unit in. Damn! Monday, the kitchen people have to come and grind it, then the gasfitters back to finish it off.
  • Then the plumber came in to install the dishwasher and the spa pump. Did the dishwater, but had forgotten the spa pump back in the office! Damn #2! So he is coming back tomorrow to finish the spa.
  • 5:00pm - Locked the house

So, here are some photos.




Ducted vacuum system

Driveway excavation complete

Rangehood cover too tall, will need to cut down and finished.