Looks like to do a clean job, so no asbestos is left on the land, the panels are being stripped manually by hand and disposed of correctly.
Just visited the site and he showed me how the builders have used small off cuts of asbestos to hold things in place behind gyprock and wood panels. Using heavy machinery before removing those tiny pieces will leave the soil contaminated. He said, with his experience of demolishing building of this era, he has to take the time to do them manually.
According to the guy, they will have the site ready by next Wednesday (10/10/2012).
P.S. I was still not happy that they delayed the process for nearly a week.