I hope they will be painted tomorrow, so that the scaffolding is lowered to work on the ground level roof tiles etc.
Downpipes for top level are also installed.
The balcony.
Finally, the cold water point behind the fridge in the kitchen is also installed.
No comments:
Post a Comment