Finally, after over 7 weeks of wait, we received our initial plans.
A quick look at the plans and it all looks good! Only very few minor changes, mostly outside taps location, manhole location etc. Will go in detail over the weekend.
One major issue is the front setback, it is 10m! I was expecting 7m, like where the current house is and like our next door neighbour. I will need to chase it up. As the way it is drawn now, I have more front yard then back yard! lol.
Next step is to choose the bricks, roof tiles, guttering, downpipes colour etc. and organise a meeting with the drafts-person to make the changes on the original plan and sign off.
I hope we can resolve the front setback size issue with no hassle.
The Window Schedule as per plan.